- 1,226
- 429
I noticed a small error in the calculation of Ishiguro.
In the calculation use the values for the concrete (6 j/cc and 17 j/cc), but it should be the values for the Steel (208 j/cc and 568.5 j/cc).
And if we use those values, it gives us:
Frag: 1.47264e+12 or 351.196 Tons (8-A)
V. Frag: 4.02498e+12 or 961.993 Tons (8-A almost Low 7-C)
Although the most probable is that these results are wrong, and they should be calculated in another way.
In the calculation use the values for the concrete (6 j/cc and 17 j/cc), but it should be the values for the Steel (208 j/cc and 568.5 j/cc).
And if we use those values, it gives us:
Frag: 1.47264e+12 or 351.196 Tons (8-A)
V. Frag: 4.02498e+12 or 961.993 Tons (8-A almost Low 7-C)
Although the most probable is that these results are wrong, and they should be calculated in another way.